RING ROAD NO.02, SECTION FROM VINH TUY BRIDGE TO NGA TU SO

25/07/2018

Narrative description of Project: 

The construction project of Ring Road No.02, section from Vinh Tuy Bridge to Nga Tu So belongs to complete plan of Ring Road No.02 Project, Hanoi City; After completed, the Ring Road No.02 will take part in allocation of traffic flow among areas of the city, reduction of traffic jam in many routs. The Ring Road No.02 í designed to satisfy increasing trafic demand between the center of Hanoi and the northern, north-east areas, complete transport system, take part in development of the Captital socioi-economic in the maner of modernization plan.

– The start point (Km0+0,00) is at the south of Vinh Tuy Bridge, the ending point (Km5+081,36) is at Nga Tu So intersection. Total length of this rout is 5081,36m;

– Main items of project are: Main bridge (cross section is B=19,00m) approach bridge (B=7,00m), approach ramp with existing road at Vinh Tuy Bridge, Nga Tu Vong intersection, Nga Tu So intersection;

– Auxiliary items: lightning system, drainage, retaining wall, sign board and traffic safty system.

11

Name of Client:
VIN GROUP
Address: No. 7 Bang Lang 1 Street , Vinhomes Riverside, Viet Hung, Long Bien, Hanoi City

Start date (month/year): 03/2017
Completion date (month/year): 03/2018

Description of actual services provided by your staff within the assignment:
– Topographic-Hydrologic survey, underground works survey, geotechnical investigation.
– Detailed design and Cost Estimation, Shop drawing design;
– Prepare Procurement document for construction packages.