PHUOC KHANH BRIDGE (BEN LUC – LONG THANH EXPRESSWAY PROJECT)

06/04/2010

Narrative description of Project:

Ben Luc – Long Thanh Expressway (Expressway type A) plays an important role in developing socioeconomic activities in the provinces and cities around Ho Chi Minh City. The project has the total length of 58km. Pavement width is dividend to 2 phases, phase 1 (4 lanes) and plan phase (8 lanes)

It includes 02 huge bridge that are Binh Khanh bridge (cable stayed bridge crossing Soai Rap river),

Phuoc Khanh bridge (cable stayed bridge crossing Long Tau river).Phuoc Khanh Bridge: Stayed cable bridge, span diagram: 149.75+300+149.75m. Bridge width B=21.75m


The Client: Vietnam Expressway Corporation (VEC), Ministry of Transport, Viet Nam

Address: Floor 4, 5, 6, Mitec building, Cau Giay District, Hanoi.

Consultant under the contract (in USD): 

USD 332,500

Implementation Period:

  • Start date (month/year): 10/2009
  • Completion date (month/year): 04/2010

No. of senior professional staff:

  • Highway Design Team Leader:    Nguyen Van Viet
  • Bridge & Tunnel Team Leader:    Tran Duc Giang
  • Chief Cost Estimator:                   Quach Viet Duong                                             
  • Chief Topographic Survey:           Vu Van Tuyen
  • Chief Manager of Geo Survey:     Vu Thanh Hai
  • Chief Hydrological Engineer:       Tran Anh Tuan

Description of actual services provided by your staff within the assignment:

Calculate structure for Phuoc Khanh Bridge

PARTICIPANTS

SERVICES