Vinh Phuc Province – Climate Improvement Project Package CP-1: Main road through New urban zone of Me Linh 28/09/2015

28/09/2015

1. Project Description:
Main road through New urban zone of Me Linh has total length of 15km, including 11km in Me Linh district and the rest in 7 communes: Tien Phong, Dai Thinh, Me Linh, Van Khe, Tam Dong, Thanh Lam and Tien Thang.
Scope of typical cross-section is 100m in width, including 02 lanes with the dimension: 9mx2=18m; 02 frontages with the dimension: 16.5mx2=33m; the width of center median is 9m; 02 median separate between road and frontage road with the dimension: 6.8mx2=13.6m; side walk dimension: 13.2mx2=26.4m

 

2.Client: PEOPLE’S COMMITTEE OF VINH PHUC PROVINCES
3. No. of senior engineers: 05 engineers
Project Director: Nguyen The Cuong
Project Manager: Nguyen Van Viet
Chief topographic survey: Pham Van Diem
Chief Highway Engineer: Do Cong Tuan
Chief Bridge Engineer: Vu Tien Thanh
4. Consultant services:
– Topographic and geological survey;
– Shop drawings for the CP-1 Package.
5. Implementation Period:
• From: 12/2011
• To: 05/ 2012